ARCHITECTS:
DesignArc
Mark Kirkhart, Principle
Dion McCarthy, Principle
Andrew Alper, Project Architect

DATES:
January 2008, Projected Completion

PROJECT SIZE:
7900 Square Feet

PROJECT COST:
$3,200,000.00

DESCRIPTION:
The existing structure was stripped bare to the studs and new foundations poured as part of this extensive remodel / addition. A Structural Steel frame has been inserted into the Master Bedroom wing and curved Tube Steel forms the circular Water Element in the Center of the builind. Terrazzo floors are used throughout the Entry Foyer, Living Room and Hallways. The Kitchen will have Bulthaup Cabinets, Counters and Equipment. Fleetwood Doors an windows will be combined with a hidden frame glass panel system for the exterior doors and windows.

   
This Arial photo by Louis Bruhnke shows the completed Guest house to the East and the start of structural framing.
         
   
Master wing with reservoir beyond
Here we are pouring the concrete garage slabs and working on structural wood framing, not ideal for our subcontractors, but we’re able to save a week.
Structural Steel complete and Wood framing about seventy five percent complete.
Here we have to roof installed and have started the plaster lath.
Louis takes these photograph on Saturday’s, but RJC is on the job and these trucks show.
The small white trailer adjacent to the job office is a 24 hour security trailer. We often recommend security for the period between when fixtures (plumbing/lighting) are installed and the security system becomes operational.
As shown in the next photo, the swimming pool is located in the courtyard off the circular element.
In month twelve we have started the pool excavation. We usually schedule pools so they phase with the completion of the house.
Paintings sitting on the Terrazzo floor waiting to be hung. I guess we’re done, almost.